×

Warning

JUser: :_load: Unable to load user with ID: 558
JUser: :_load: Unable to load user with ID: 828
JUser: :_load: Unable to load user with ID: 804

ArcHaus Receives a Facelift from Remmers

The exterior of this iconic building was suffering with high levels of damage, including salt ingress and excessive cracking to the render and brickwork.

Salt Inhibitor was used as a ‘masonry salt blocker’ and applied to the exposed brickwork. Large areas of the render were repaired with Restoration Render and the deep section repairs were completed with Remmers Betofix R2, a fast curing, high strength concrete repair mortar.

OS Concre Fill and Impregnation Primer were also applied prior to the application of the final protective coating system.

To mitigate reflective cracking in the future, Remmers Elastoflex system with reinforcement was applied throughout, giving a high degree of finish to the exterior of this 1930’s landmark building.

Share this article

Login to post comments

About us

Future Constructor & Architect is a specification platform for architects and building contractors, which focuses on top-end domestic and commercial developments.

As well as timely industry comment and legislation updates, the magazine covers recent projects and reviews the latest sustainable building products on the market. Subscribe here.

Privacy policy

Latest updates

e-newsletter

Sign up below to receive monthly construction, architecture and product updates from FC&A via email: