Wundatherm consists of pre-formed aluminium coated boards that are bonded to the floor with spray adhesive. Once in place, high output 16mm floor heating pipe is laid into the pre-formed grooves in the boards, with up to 150 sq. metres taking two people just two days to install. Once the boards and pipes are down, any floor covering can be laid straight away.
Compatible with heat pumps, solar panels or any existing gas/oil boilers, Wundatherm can be laid by any tradesmen and only requires a plumber to commission the system and an electrician to fit the controls.
Wundatherm takes minutes to reach operating temperature, unlike screed which takes up to 48 hours, and the leak-proof pipes carry a lifetime guarantee.